Failure of 400kV line Rzeszów-Skawina-Tarnów

Attention!!! Breakdown? We can handle it 😊
One of the latest challenges was the urgent realisation of an access to a broken pole of the 400kV line Rzeszów-Skawina-Tarnów. Within two days of the order, we started assembling the nearly one-kilometre-long access section together with the working platform. The access ran on the slope of a hill with a steady incline locally reaching 20%. Depending on the slope, we used Metrum5, Strong and Aluminium slabs. In the end, we delivered and embedded 4,500m2 of road slabs, allowing all the necessary equipment to enter the site safely and under its own power, including a 350t crane (without ballasts). Thank you to the entire Eltel team for your trust and successful cooperation.